Development of scenarios of Spanish Power System

L. Rouco I. Egido

November 2005 - April 2006

Funding entity Endesa Generación


The aim of this project is the development of scenarios of the Spanish power system including a detailed representation of the transmission network. Dispersed information about generation, demand and new transmission facilities are integrated. Three scenarios are developed: 2006, 2008 and 2011. The final outcome of the project are three solved load flow files in the standard format used by Endesa.


EndesaEscenariosRed